Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the foogallery domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the responsive-lightbox domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php on line 6170

Warning: Cannot modify header information - headers already sent by (output started at /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php:6170) in /usr/share/php/wp-stack-cache.php on line 1683

Warning: Cannot modify header information - headers already sent by (output started at /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php:6170) in /usr/share/php/wp-stack-cache.php on line 1684

Warning: Cannot modify header information - headers already sent by (output started at /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php:6170) in /usr/share/php/wp-stack-cache.php on line 1685

Warning: Cannot modify header information - headers already sent by (output started at /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php:6170) in /usr/share/php/wp-stack-cache.php on line 1683

Warning: Cannot modify header information - headers already sent by (output started at /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php:6170) in /usr/share/php/wp-stack-cache.php on line 1684

Warning: Cannot modify header information - headers already sent by (output started at /home/sites/28b/f/ffc00da92c/public_html/wp-includes/functions.php:6170) in /usr/share/php/wp-stack-cache.php on line 1685
Sussex Plumbing Supplies – Polegate Showroom – Taylor Construction
Taylor Construction
Case Study

Sussex Plumbing Supplies – Polegate Showroom

JOB DESCRIPTION

Following continued growth and expansion, independent plumbing merchants Sussex Plumbing Supplies decided to open a flagship Luxury Bathroom and Designer Heating showroom in the newly constructed Chaucer Business Park in Polegate. Not only was this going to be spread over two floors, it was to also become their new head office, relocating them from their original offices above the Eastbourne trade counter.

TAYLOR CONSTRUCTION’S ROLE

Following the success of the Bexhill Showroom renovation, Taylor Construction were tasked the entire internal showroom build, office build, full decoration and complete fitting of each individual bathroom and heating display.

The head office area consisted of an open plan working area, board room, kitchen facilities, relaxed seating area as well as individual offices, all with floor to ceiling glazing.

Staff and customer toilets were installed along with a separate easy access toilet.

Throughout the Luxury Bathrooms department on the lower floor, every display was installed with the same care and attention as would be taken with a regular residential fitting. A number of the installation were joined to the mains water for ‘live’ demonstrations

Throughout the process, Taylor Construction took care of the following aspects

  • Drywall construction
  • Air conditioning
  • Electrics
  • Plumbing
  • Glazed Tiling
  • Decoration
  • Specialist Flooring

The outcome was fantastic. A showroom that we are all extremely proud of and has been greatly received by the public.